A13914AF
9-68
Maintenance
As-Needed/As-Required Maintenance
Replace the Sodium Measure/Reference Electrode
The Sodium Measuring Electrode must be prepared before installation of a new electrode.
Materials Required:
•
Beaker
•
Na/K-free filter paper
•
Phillips screwdriver
Follow the steps below to prepare the Sodium electrode (PN 668295).
1
In a small beaker, prepare a soft bottom lining using crumpled multiple layers of Na/K-free
filter paper (2).
Pour ISE Reference solution (do not dilute) into the beaker to a depth not to exceed two inches
(50 mm) (1).
Figure 9.46
2
Unpack a new sodium electrode. Carefully remove black protective cap covering glass tip.
IMPORTANT
If maximum soaking time is not allowed, the new electrode may require a few hours of
operation to achieve complete electrical stability. During this period, more frequent calibration than
normal may be required in response to system error messages. Assay results are not compromised during
this time.
3
Soak the electrode:
•
1 hour minimum
•
24 hours maximum
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......