A13914AF
4-18
Reagent Load/Calibration
Calibration Failure Messages
•
All other calibrators need 3 drops of calibrator in a 0.5 mL cup.
7
Place the rack (1) in the autoloader (2) with the rack bar code label to the right. Press
RUN
(3)
on the analyzer. Refer to
Cancel a Calibration Request
1
Select
Rgts/Cal
from the menu bar.
2
Select the appropriate requested and assigned chemistries to be canceled.
3
Select
No Cal F8
to cancel calibration request.
Chemistries currently selected and programmed for calibration may be canceled only if the
calibration is not yet in progress.
Calibration reports for a given calibrator do not print until all calibrations are complete for each
chemistry requested, unlike sample and control results, which print on a cup-by-cup basis.
Calibration Failure Messages
Introduction
If there is a failure during calibration, for modular chemistry (MC) or cartridge chemistry (CC), there
is a pop-up message which shows:
•
The chemistry that failed and
•
The associated error code(s).
After a failure message, the operator can:
•
Stop the calibration or
•
Continue the calibration.
CC Subsystem Calibration Failure
The CC subsystem warns the operator of a failed calibration. If a chemistry fails, a pop-up message
appears after a completed calibrator level. The message includes:
•
Calibrator name
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......