A13914AF
9-96
Maintenance
As-Needed/As-Required Maintenance
5
Slowly inject the Diluted Clenz Solution into the flow cell. Be sure that liquid completely fills
the flow cell and that there are no air bubbles in the line. DO NOT REMOVE SYRINGE FROM THE
LINE.
6
Allow the system to stand idle for five minutes. DO NOT REMOVE SYRINGE FROM THE LINE
DURING THIS TIME.
7
Pull back on the syringe plunger to completely remove the Clenz Solution from the flow cell.
8
Disconnect the tubing from the bottom of the flow cell.
9
Reconnect line #23 to the bottom of the flow cell.
10
When the necessary cleaning is completed, select
OK
to close the dialog box.
IMPORTANT
Reagents immediately prime through the flow cell.
While the flow cell is priming, verify there are no fluid leaks.
11
After the pop-up message appears, select
Close
to exit the
ISE Service
screen.
12
Rinse the syringe, connector, and tubing with deionized water. Dry and store for future use.
13
Prime the flow cell.
•
Select:
—
Utils
from the menu bar,
—
1 Prime
,
—
MC F4
,
—
ISE All
check box.
•
Type
20
in the
Number of primes to repeat
field.
•
Select
Start Prime
.
CAUTION
Pinch hazard. Keep fingers clear of the ISE module as you lower it.
14
Lower the ISE module by releasing the locking pin. Be careful NOT to pinch tubing as the module
is lowered.
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......