A13914AF
9-54
Maintenance
Six-Month Maintenance
ISE Service
The ISE service procedure prevents reagent leakage from the flow cell whenever electrode removal
is required.
1
Loosen the two Phillips screws (1) on the ISE module cover and remove the cover.
Figure 9.34
2
Release the locking pin (1) on the ISE module and lift the module until it clicks into a raised,
locked position. The locking pin is located on the left side of the ISE module on DxC 800 Systems
as shown below. The locking pin is located on the right side of the ISE module on DxC 600
Systems.
Figure 9.35
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......