10
Adding Systems
Adding an Auxiliary Gas System
532
TRACE 1300 and TRACE 1310 Hardware Manual
Thermo Scientific
Installing the Auxiliary Gas Interface on the Oven for HRMS
To make the duct into the oven for HRMS
1. Remove the left/right side panel.
a.
Open the front door of the GC.
b. Use a T20 Torxhead screwdriver to loosen the left/right side panel screw from the
interior front panel. Save the screw because it will be reused later.
c.
Slide the panel towards the back of the instrument up to the stop.
d. Remove the panel pulling it outward being aware that the ground wire is attached to
the panel.
2. Prepare the duct for the installation of the auxiliary gas interface.
a.
On the left/right exterior wall of the oven box, remove the partial cut plate of the
duct of interest.
b. Remove the pre-shaped plug of insulating material from the duct provided. See
Figure 580.
Left/Right Exterior Oven Wall Box View
c.
On the interior of the oven box, remove the partial cut plate from the corresponding
duct. See
Right Oven Wall
Left Oven Wall
IMPORTANT
Save the pre-shaped plug of insulating material in a safe place because it
could be reused.
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......