8
Installing Optional Kits
Performing the Dual FPD Detector Configuration
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
419
17. Power on the GC.
a.
Plug the power cable to the AC Input connector into the back of the GC and to the
wall outlet.
b. Flip up the power switch (breaker) to the position I.
Set the working parameters
18. Set the parameters for the primary FPD detector (back).
a.
Set the flow of the gases, the temperatures, the ignition threshold, and the PMT
voltage for the primary photomultiplier tube according to the working analytical
conditions.
19. Set the parameters for the secondary FPD detector (front).
a.
Set the flow of the gases and the temperatures to
Off
.
b. Set the PMT voltage for the secondary photomultiplier tube.
20. Turn on the Flame On parameter of the primary FPD detector.
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......