8
Installing Optional Kits
Performing the Dual FPD Detector Configuration
418
TRACE 1300 and TRACE 1310 Hardware Manual
Thermo Scientific
a.
Connect the signal, excitation voltage and ignition/heating cables coming from the
control module installed into the back site to the primary
FPD detector.
See
Figure 436.
Primary FPD Detector Cables Connection
b. Connect the signal, excitation voltage and ignition/heating cables coming from the
control module installed into the front site to the secondary FPD detector.
See
Figure 437.
Secondary FPD Detector Cables Connection
Restart the GC and set the working parameters
16. If other external modules are present, plug the power cable to the AC Input connector of
each module, and to the wall outlet.
Excitation Voltage Cable
Signal Cable
Ignition Heating Cable
Excitation Voltage Cable
Signal Cable
Ignition Heating Cable
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......