1
Installation
Coupling to a Mass Spectrometer
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
23
c.
Plug the power cable to the AC Input connector on the front of the module and to
the wall outlet. The LED marked
On
lights up after the GC power on.
]
Coupling to a Mass Spectrometer
This section provides instruction for opening the duct to introduce the transfer line inner
tube into the oven of your TRACE 1300/TRACE 1310 version for MS.
According to the mass spectrometer unit to couple, see the following sections:
•
“Making the Duct to Couple with an ISQ Series, TSQ 8000 Series, DSQ II, or ITQ
Mass Spectrometer”
.
•
“Making the Duct to Couple with a TSQ Quantum Mass Spectrometer”
.
•
“Making the Duct to Couple with a DFS, IRMS, or ICP-MS Mass Spectrometer”
Making the Duct to Couple with an ISQ Series, TSQ 8000 Series, DSQ II, or ITQ Mass
Spectrometer
To make the duct for the transfer line
1. Remove the left side panel.
a.
Open the front door of the GC.
b. Use a T20 Torxhead screwdriver to loosen the left side panel screw from the interior
front panel. See
. Save the screw because it will be reused later.
Figure 27.
Left Side Panel Fixing Screw
Note
For further details regarding the installation of the Aux Temperature/Cryo module,
see the section
“Adding an Aux Temperature/Cryo Module”
.
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......