10
Adding Systems
Adding the Oven Cryo System
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
499
Installing the Oven Cryo System
To install the Oven Cryo System
1. Put the GC in standby condition.
2. Cool the oven, injectors, and detectors to room temperature.
3. Close the gas supplies.
4. Power off the GC.
a.
Push down the power switch (breaker), located at the back of the instrument, in the
position O.
b. Unplug the power cable from the AC Input connector into the back of the GC and
from the wall outlet.
5. If external modules are present, unplug the power cable from the AC Input connector of
each external module, and from the wall outlet.
6. Remove the Left Side panel.
a.
Open the front door of the GC. Using a T20 Torxhead screwdriver, unscrew the left
side panel screw from the interior front panel. See
Figure 533.
Left Side Panel Fixing Screw
b. Slide the panel towards the back of the instrument up to the stop.
c.
Remove the panel by pulling it outwards. Be aware that the ground wire is attached
to the panel. See
Note
By pressing the
Maintenance
button, the GC cool down is automatically
carried out.
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......