3
Performing Injectors Routine Maintenance
Maintaining a Programmable Temperature Vaporizing Injector (PTV)
120
TRACE 1300 and TRACE 1310 Hardware Manual
Thermo Scientific
Replacing the PTV Septum
To replace the septum
Figure 104.
PTV Injector: Septum Replacement
1. Put the GC in standby condition.
2. Cool the oven and injector to room temperature.
3. Turn the carrier gas off, and wait for the carrier pressure to go to zero.
4. Put the autosampler away if present.
5. Open the module flap cover.
6. Replace the septum.
a.
Unscrew the septum cap of the injector.
b. Using tweezers, remove the septum from the injector head assembly.
Note
For maintaining or replacing any other component not listed in this section, see
Chapter 6, “Injectors Advanced Maintenance.”
•
“Baking-out Contaminants from SSL, SSLBKF, HeS-S/SL, PTV, and PTVBKF
Injectors”
•
“Removing/Replacing an Injector Module”
•
“Cleaning the PTV Injector Head Assembly”
Note
By pressing the
Maintenance
button, the GC cool down is automatically
carried out.
Septum
Septum Cap
Injector Head Assembly
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......