8
Installing Optional Kits
Installing the NoVent Microfluidics
378
TRACE 1300 and TRACE 1310 Hardware Manual
Thermo Scientific
5. Open the front door of the mass spectrometer.
6. Look behind the right side of the vacuum interlock shield and twist the vent valve knob
one and a half times in a counter-clockwise direction to open the vent valve.
7. Wait five minutes for the mass spectrometer to vent.
8. Open the front door of the GC and loosen the transfer line nut. Then pull the column
back (into the oven) about 5 cm to ensure the column is no longer in the ion source.
9. Close all GC gas supplies. Shut the carrier gas supply off at its source, such as the tank.
10. Remove the dummy module from the position where the NoVent Microfluidics will be
installed. The most convenient location for accessing the tubing connections is the front
position.
a.
Open the module flap cover.
b. Using a T20 Torxhead screwdriver, unscrew and remove the two captive fixing
screws.
c.
Keeping the dummy module flap cover open, lift up the module from its seat in the
detector housing. Place the dummy module on a clean surface.
d. Remove the gas plug by unscrewing its fixing screw using a T20 Torxhead
screwdriver.
Figure 374.
Removing the Detector Gas Plug
Gas Connections Without Gas Block Plug
Gas Block Plug on Detector Seat
O-rings
WARNING
Make sure all four o-rings are correctly seated on the gas connection. Do not
install the module if the o-rings are missing.
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......