background image

 

Varian, Inc. 
2700 Mitchell Drive 
Walnut Creek, CA 94598 USA 

 

Saturn

®

 2000 GC/MS

 

Pre-Installation Instructions

 

The information provided here will help you identify and prepare a suitable installation site for 
your Saturn GC/MS. After you have prepared the site, and your Saturn GC/MS has been 
delivered, please contact your local Varian, Inc. office to schedule your installation. 

For Saturn 2100 systems, refer to these instructions plus the 3900 GC Pre-Installation 
Instructions. For other Saturn systems, refer to these instructions plus the CP-3800 GC  
Pre-Installation Instructions.  

The Varian Saturn GC/MS has been designed to operate reliably under carefully controlled 
environmental conditions. It is your responsibility to provide a suitable location, power source, 
and operating environment. Operating or maintaining a system in operational conditions outside 
of the power and operating environment limits described below could cause failures of many 
types. The repair of such failures is specifically excluded from the Warranty and Service 
contract conditions. 
 

CAUTION

 

All phases of the installation site preparation must conform to local safety, 
electrical, and building codes. These codes take precedence over any 
recommendations in these instructions, and compliance to them is the 
responsibility of the customer. 

Contents

 

Space and Weight Requirements............................................................ 2

 

Power Requirements ............................................................................... 3

 

Operating Environment............................................................................ 5

 

Temperature/Humidity ...................................................................... 5

 

Particulate Matter.............................................................................. 6

 

Vibration............................................................................................ 6

 

Exhaust System................................................................................ 6

 

Gas Requirements................................................................................... 6

 

GC Carrier Gases ............................................................................. 6

 

CI Reagent Gases (with CI option only) ........................................... 6

 

Other Gases ..................................................................................... 7

 

Gas Lines.......................................................................................... 7

 

Capillary Columns ................................................................................... 7

 

Solvents................................................................................................... 7

 

Network Requirements ............................................................................ 7

 

Computer/Printer Requirements.............................................................. 7

 

Specifications.................................................................................... 7

 

Qualified PCs.................................................................................... 8

 

Qualified Printers .............................................................................. 8

 

Inspection ................................................................................................ 8

 

Unpacking and Installation ...................................................................... 9

 

Parts and Supplies .................................................................................. 9

 

Preventive Maintenance .......................................................................... 9

 

Trademark Acknowledgment................................................................... 9

 

03-914629-00:7 

1

 

of 9 

Saturn 2000 GC/MS Pre-installation Instructions

 

Содержание Saturn 2000 GC/MS

Страница 1: ...tside of the power and operating environment limits described below could cause failures of many types The repair of such failures is specifically excluded from the Warranty and Service contract condi...

Страница 2: ...24 11 Tekmar 3000 Purge and Trap 19 48 9 23 18 46 37 17 Archon Purge and Trap AutoSampler 17 43 22 55 21 53 80 36 Tekmar ALS 2016 27 69 15 38 15 38 35 16 Genesis Headspace AutoSampler 22 56 28 71 18...

Страница 3: ...e fourplex power sources is for the mass spectrometer computer monitor and printer the other fourplex power source is for the gas chromatograph and optional 8200 AutoSampler If you have additional sam...

Страница 4: ...NEMA 5 15P plugs The power cable from the 8200 AutoSampler is about 2m 6 ft long and is fitted with a NEMA 5 15P plug rated at 120V With a 120V power source the maximum amperage requirements for each...

Страница 5: ...optimum operating temperature is between 18 and 21 C 65 and 70 F NOTE As laboratory temperature increases system reliability decreases All electronic components generate heat while operating This heat...

Страница 6: ...rmance of the Saturn GC MS it may also damage such components as the capillary column filaments and multiplier Varian recommends that you verify that your gas suppliers use controlled tanks this will...

Страница 7: ...he back panel of the CP 3800 GC or 3900 GC In addition the company network must allow TCP IP communications to be routed across it from the GC to the Saturn GC MS Workstation For basic Ethernet cablin...

Страница 8: ...5e driver Lexmark 3000 Color Jetprinter Inspection When your Saturn GC MS arrives carefully inspect the exterior of the shipping cartons for evidence of any damage that might have occurred during ship...

Страница 9: ...ans to analyze samples with the system until after the installation has been completed and you have accepted the conditions of delivery Parts and Supplies The Saturn 2000 GC MS Hardware Manual provide...

Отзывы: