GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A414 - Power Line Filter Box
Page no. 1623
Chapter 9
JC-DR-A-414.fm
rotary switch in the Generator cabinet (position I).
13. Switch on the Senographe system electrical power (i.e. Generator, Gantry, and Control Station).
14. Wait until the Gantry boot is complete, and check that no error has been reported.
15. Reinstall the Generator covers (see
Job Card PHY A042 - Remove/Reinstall Generator Covers
7
COMPLETION
None.