GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A266 - Tube Tilt Board
Page no. 1365
Chapter 9
JC-DR-A-266.fm
Job Card D/R A266 - Tube Tilt Board
Chapter 9
1
SUPPLIES
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 2 hours
4
SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5
PREREQUISITES
•
Rotate the arm to 0° and move it to its lowest position for
access to the Tilt Board (1).
•
Switch off the Gantry power.
•
Remove the tube cover (Refer to
Remove/Reinstall Gantry Covers
).
1