GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card PM A205 - Mechanical checks and lubrication
Page no. 1779
Chapter 11
JC-PM-A-205.fm
Job Card PM A205 - Mechanical checks and lubrication
Chapter 11
1
SUPPLIES
•
Grease (for Lift and Rotation)
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 20 minutes
4
SAFETY PRECAUTIONS
WARNING
Before working on any Gantry mechanism, shut down the equipment and switch OFF the
Senographe hospital supply circuit breaker. Lock it in the OFF position or mark it clearly
with a warning sign to prevent others from applying power.
•
NEVER switch off at the UPS except in emergency (risk of data loss).
5
PREREQUISITES
•
The Gantry Column and Compression Arm covers must be removed. Refer to
Remove/Reinstall Gantry Covers
.
•
Release the four hex head screws securing the lower X plate (10 mm open-ended wrench).