Chapter 9
Page no. 1128
JC-DR-A-189.fm
GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A189 - Interface Board
3. Ensure that jumper TP1 (3) that is to the left of the J4 connector on the Interface board is open.
4. Re-install the Gantry CPU board on the Interface board according to
Job Card D/R A190 - Gantry CPU Board
.
5. Lift the top metal panel up to release it from the left side of the framework and replace it over the
framework to hide the newly installed Gantry CPU board.
6. Switch on the Gantry electrical power.
7. Wait until the Gantry boot is complete, and check that no error has been reported.
If the Interface board is operating correctly, the LED states are as follows:
•
all three of the green LEDs in the upper part of the Interface CPU board near the fiber connectors
J8, J9 and J10 (i.e. DS1, DS2, and DS3) are ON
•
the green LEDs DS8 and DS11 near the J5 connector are blinking (i.e. there is network activity on
the Ethernet connection)
•
all the other green LEDs near the J5 connector (i.e. DS4, DS5, DS6, DS7, DS9, DS10, DS12, and
DS13) are OFF
8. Reinstall the column cover (CPU side); refer to
Job Card PHY A044 - Remove/Reinstall Gantry Cov-
.
Connector
Label
Description of cable
(usually identified by code on a yellow label)
Cable color
J1
J1/PL104-W116
Gray
J2
J2/PL104-W101
Gray
J3
J3/PL104-W208
Gray
J4
J4/PL104-W402
Black
J5
J5/PL104-W314
Gray
J6
J6/PL104-W216
Black
J7
J7/PL104-W217
Black
J8
W121 - PL104 - J8
(to top fiber connector)
Black
J9
W120 - PL104 - J9
(to middle fiber connector)
Black
J10
W119 - PL104 - J10
(to bottom fiber connector)
Black
J11
Empty
N/A
Eth
Switch-AWS
(RJ-45 connector at bottom)
Gray
3