
Chapter 8 Program
8-86
8.2.3 Operation Ready
(1) Connecting servo driver
(a) Condition for servo connection
Condition to execute Servo connection command (XPM_ECON)
(b) Link up/down information
If you use Link up down information as input condition point of servo connection command, you can execute
the command only when network cable is actually connected.
(c) Address of Positioning Module
Before operation, you need t o configure its position by numbers. In this example, Positioning Module is
installed at the 3 slot.
(d) State of Operation complete
If function block is completed without error, “1” will be outputted and m aintain “1” until the next operation. If
error occurred, “0” will be outputted.
(e) Error State
This is the area that output error no. if there are errors in operation of function block.
(f) Axis ready state
If connection with servo driver is established, corresponding signal will be on. In the example, we assume that
two axes are connected to the module. Set the only connected axis according to system. If connection is
complete, corresponding signal will be on and reset the condition for servo connection.
(b) Link up/down information
(a) Condition for servo connection
(f) Axis ready state
(e)Error state
(d) Completion state
(c) Position of the module
_0003_LINK
UP_INFO
Summary of Contents for XBF-PN04B
Page 1: ...Programmable Logic Controller Positioning Module EtherCAT XGB Series XBF PN04B XBF PN08B ...
Page 626: ...Chapter 9 Functions BPS37 setup RS232 and PC connection BPS37 option board LED 9 193 ...
Page 796: ...Appendix3 Dimension A3 1 Appendix 3 Dimension Appendix 3 1 Dimension of XBF PN04B PN08B ...