1
1.4
”SIMODRIVE 611 universal E” control board
1-53
Siemens AG 2005 All Rights Reserved
SIMODRIVE 611 universal Description of Functions (FBU) – 04.05 Edition
1.4.4
Commissioning the board with ”SimoCom U”
The following prerequisites must be fulfilled in order to be able to com-
mission a drive using the ”SimoCom U” parameterizing and start–up
tool:
1. All of the prerequisites for commissioning are fulfilled, according to
Chapter 4.1 this means that the system with ”SIMODRIVE 611 uni-
versal E” can be commissioned.
2. The checklist for commissioning according to Chapter 4.1 has been
checked.
3. The optional PROFIBUS–DP3 module is inserted into the control
board (refer to Chapter 1.3.3).
4. The ”SimoCom U” tool is installed on the PC/PG, which is to be
used to commission the drive.
5. There is a connecting cable between the PG/PC and control board
(RS232 connecting cable, refer to Chapter 2.5).
6. The PC/PG with ”SimoCom U” is connected to the control board
(X471).
Reader’s note
Cable diagrams for the connecting cable
refer to Chapter 2.5
Everything about ”SimoCom U”
refer to Chapter 3.3
Requirements
1 Product Overview
01.99
10.99
! not 611u !