4
01.99
4.3
Commissioning via SimoCom U
4-121
Siemens AG 2005 All Rights Reserved
SIMODRIVE 611 universal Description of Functions (FBU) – 04.05 Edition
4.3.1
First commissioning with SimoCom U
When ”SIMODRIVE 611 universal” is first commissioned using the
”SimoCom U” parameterizing and start–up tool, proceed as follows:
1. Power–up the drive group
2. Start SimoCom U
3. Request online operation for drive A
Operator action:
Execute the ”Search for online drives” function in the ”Start–up”
menu, and select drive A in the ”Drive and dialog browser”.
Is the ”start–up required” window displayed?
– Yes: ––> Start the drive configuration assistant
––> This signals the drive the existing configuration (power mo-
dule, motor, etc.).
– No: ––> Press ”re–configure drive” button
––> This adapts the control board to the present configuration
(power module, motor, etc.).
4. Execute the drive configuration, and at the end, press the ”Calculate
controller data, save, reset” button.
5. Carry–out basic commissioning
Set the ”Drive and dialog browser” (lefthand window) to ”Parameter”.
To do this, press the ”P Par” button below the browser.
The commissioning is now executed by working through the remain-
ing dialog boxes for this drive in the ”Drive and dialog browser” from
the top to the bottom. The required settings are made in the se-
lected dialog boxes.
Note
If drive B is to be commissioned, then the points must be executed for
drive B from point 3 onwards.
Procedure when
commissioning the
drive for the first
time
4 Commissioning
10.99