
4-136
Figure 4-237: Umbilical hose wire tie location
82.
Align the left side access panel with the mounting holes.
83.
Using a
5
⁄
16
” nut driver, reinstall the 7 left side access panel mounting screws.
84.
Align the right side access panel with the mounting holes.
85.
Using a
5
⁄
16
” nut driver, reinstall the 7 right side access panel mounting screws.
86.
Reinstall the front cover. See
Installing the front panel on page
87.
Reinstall the side panels. See
Installing the side panels on page
88.
Reinstall the top panel. See
Installing the top panel on page
89.
Power up the printer.
90.
From the display panel press
Maintenance > Machine > Tips.
91.
Perform Z calibration. See
92.
Perform XY Offset calibration. See
93.
Perform Part Based calibration. See
Performing part based calibration for uPrint, uPrint
SE, uPrint Plus and uPrint SE Plus from the Service Calibration menu (Firmware version
Reinstall wire tie
Summary of Contents for uPrint
Page 1: ...uPrint and uPrint Plus uPrint SE and uPrint SE Plus Service Manual Part No 209010 0001 Rev D...
Page 11: ...1 2...
Page 35: ...2 24...
Page 179: ...4 132 Figure 4 231 uPrint Plus and uPrint SE Plus measurement points and worksheet BL FL FR BR...
Page 207: ...4 160 Figure 4 275 uPrint and uPrint SE measurement points and worksheet BL FL FR BR...
Page 267: ...5 58...
Page 343: ...6 76...
Page 359: ...7 16...
Page 373: ...8 14...