ZS3 Service Manual
Page 246 of 295
Figure 19.36-ZS3
6.
Reverse the steps above to install the replacement User Interface.
If replacement of the trackball is required, proceed to Trackball
Replacement steps
prior
to re-installing the User Interface (Refer to
section below).
If replacement of the QWERTY keyboard is required, proceed to
QWERTY Replacement steps
prior
to re-installing the User Interface
(Refer to section below).
Trackball Removal/Replacement: (if changed separately)
1.
Ensure the User Interface is removed per steps 1 thru 5 of User Interface
Removal Procedure above.
2.
Push the 4 hooks inward in the square hole of the metal plate, pick up the
trackball, unscrew the screws used for fixing the grounding cable, and then
remove the trackball.
Power Cable
USB Cable
Summary of Contents for Zonare ZS3
Page 1: ...ZS3 Diagnostic Ultrasound System Service Manual ...
Page 120: ...ZS3 Service Manual Page 120 of 295 FTP Setup Enters Setup Network FTP ...
Page 124: ...ZS3 Service Manual Page 124 of 295 ...
Page 131: ...ZS3 Service Manual Page 131 of 295 13 System Diagrams ...
Page 132: ...ZS3 Service Manual Page 132 of 295 Power Block Diagram Figure 13 1 ZS3 Power Block Diagram ...
Page 133: ...ZS3 Service Manual Page 133 of 295 Cabling Diagram Figure 13 2 ZS3 Cabling Diagram ...
Page 138: ...ZS3 Service Manual Page 138 of 295 Figure 14 6 ZS3 ...
Page 185: ...ZS3 Service Manual Page 185 of 295 17 Preventative Maintenance Forms ...
Page 217: ...ZS3 Service Manual Page 217 of 295 Figure 18 8 ZS3 ...
Page 252: ...ZS3 Service Manual Page 252 of 295 Figure 19 43 ZS3 Power Cable USB Cable ...
Page 295: ...P N 046 014026 00 2 0 ...