
select
tResResponse
timer
reservation granted RES_GRT
t1>tResResponse, then
1-of-n-control in 'cause'
is set
t1
reservation request RES_RQ
command termination
en05000093.vsd
IEC05000093 V1 EN
Figure 333:
tResResponse
The timer
tExecutionFB
supervises the time between the execute command and the
command termination, see figure
.
execute command
phase A
t1>tExecutionFB, then
long-operation-time in
'cause' is set
open
close
close
open
phase C
close
open
phase B
t1
tExecutionFB
timer
command termination
phase A
command termination
phase B
command termination
phase C
command termination
circuit breaker open
close
* The command termination will be delayed one execution sample.
*
en05000094_ansi.vsd
ANSI05000094 V1 EN
Figure 334:
tExecutionFB
The parameter
tSynchrocheck
is used to define the maximum allowed time between the
execute command and the input SYNC_OK to become true. If SYNC_OK=true at the
time the execute command signal is received, the timer "tSynchrocheck" will not start.
The start signal for the synchronizing is obtained if the synchronism-check conditions
are not fulfilled.
Section 12
1MRK505222-UUS C
Control
666
Technical reference manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Line differential protection RED670 ANSI Technical reference manual...
Page 2: ......
Page 40: ...34...
Page 50: ...44...
Page 60: ...54...
Page 126: ...120...
Page 384: ...378...
Page 496: ...490...
Page 556: ...550...
Page 602: ...596...
Page 620: ...614...
Page 794: ...788...
Page 864: ...858...
Page 988: ...982...
Page 998: ...992...
Page 1084: ...1078...
Page 1164: ...1158...
Page 1168: ...1162...
Page 1220: ...1214...
Page 1230: ...1224...
Page 1231: ...1225...