![Mova D506i Скачать руководство пользователя страница 264](http://html.mh-extra.com/html/mova/d506i/d506i_user-manual_1841068264.webp)
262
Using
the
Timer
a
nd
Schedule
Functions
11
Saving Tasks in the ToDo List
ToDo List
ToDo
List
ToDo List can be used as a task reminder.
•
Maximum number of items that can be saved: 20 finished and unfinished tasks in total
•
To Do list tasks cannot be saved in ToDo List when the date and time have not been set.
•
To Do list tasks can be saved in the period between January 1, 2002 and December 31, 2099.
1
The listed unfinished task page of the ToDo List appears.
In standby, select “useful function”
“ToDo list” from the menu.
2
Select “compose new” from the submenu.
3
Set the storage date.
1
Select the “add” field and press
(select).
2
Use
to
to enter the date and press
(fix).
•
Entering the date (see p.43)
4
Set the deadline.
1
Select the “term” field and press
(select).
2
Use
to
to enter the date and press
(fix).
5
Enter the details.
1
Select the “contents” field and press
(select).
2
Enter the details of the task (up to 80 single-byte or 40 double-byte characters).
6
Press (store).
The ToDo list task is saved.
Mark
if the task has finished. (Usually, it is not selected when saving a new
task.)
Set the storage date. The current day is displayed, so you can change as needed.
Enter the details.
Set the deadline (date) of the task as needed.
▲
M64
Содержание D506i
Страница 1: ... 04 4 Manual for ...
Страница 226: ...224 ...
Страница 318: ...316 ...
Страница 416: ...414 ...
Страница 480: ...478 ...
Страница 624: ...622 MEMO ...
Страница 625: ...623 MEMO ...
Страница 626: ...624 MEMO ...
Страница 627: ...625 MEMO ...
Страница 628: ...626 MEMO ...
Страница 629: ...627 MEMO ...
Страница 630: ...628 MEMO ...
Страница 631: ...629 MEMO ...