Inspection and Maintenance — GEK 107048
Standard Practices
SP-48
MS-6001B DLN-1 — Hot Gas Path Inspection Recommended Spare Parts (Cont’d)
Recommended
Quantity
PIPING ARRANGEMENT PRIMARY FUEL GAS (ML0911) (If Applicable To Unit)
**1.
Gasket (Gas Line Flange to Fuel Nozzle)
10
**2.
Gasket (Gas Line Flange to Gas Manifold Flange)
10
3.
Bolt, Hex Head (Fuel Nozzle and Gas Manifold Flange)
*16
*
4.
Nut, Self Locking (Fuel Nozzle and Gas Manifold Flange)
*16
*
PIPING ARRANGEMENT (PRIMARY SECONDARY TRANS.) FUEL GAS — (SAME AS PRIMARY FOR
PARTS)
PIPING ARRANGEMENT COOLING AND SEALING AIR (ML0909)
Note:
The list of gaskets, nuts, bolts and connectors male and female shown
below with varying quantities, indicates that there are different sizes
required. Using the applicable piping arrangement cooling and sealing
air piping arrangement drawing, the user should procure the gasketing
quantities shown and approximately 20% of the hardware quantities
shown to cover any hardware which may not be reusable.
**1.
Gasket
5
**2.
Gasket
5
**3.
Gasket
8
**4.
Gasket
6
**5.
Gasket
4
6.
Locking Plate, Nut & Bolt
*10
*
7.
Bolt, Hex Head (.500-13 x 2.25)
*4
8.
Bolt, Hex Head (.625-11 x 3.00)
*15
*
9.
Bolt, Hex Head (.625-11 x 3.25)
*8
10.
Bolt, Hex Head (.750-10 x 3.75)
*4
11.
Bolt, Hex Head (.750-10 x 10.50)
*8
12.
Connector, Male
2
13.
Connector, Male
1
14.
Connector, Male
2
15.
Connector, Male
10
16.
Connector, Tube Female
1
17.
Elbow, Union
3
18.
Elbow, Union
2
19.
Elbow, Union
7
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......