Combustion Inspection — Reassembly Procedures
Inspection and Maintenance — GEK 107048
CI-R-9
Figure CI-R.6. Transition Piece First-Stage Nozzle to Retaining Ring Clearance Checks.
Transition
Piece
Nozzle
See Standard Practice Section 2
Approx. 5 in.
0.160
0.090
1.0 in.
0.200 Typ.
70
°
3/16 in. Thru Hole
1/2
(X)1
(X)2
3(X)
4(X)
5(X)
(X)6
0.090
0.160
0.090
0.160
in.
Special Tools in This Manual
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......