Scheduled Turbine Maintenance
Inspection and Maintenance — GEK 107048
STM-17
Table 4-2
MS-6001B DLN-1 Borescope Access Holes Location
Location
Casing Hole
Thread Size
*Dimension From Forward
Face of Compressor
Discharge Case Flange
Number
of Holes
Seventeenth-stage
compressor
1.00-8UNC-2B
18.7 in. (Forward)
1
Combustion liners
3/4 in. NPT
Combustion outer
casing radial outside
10
First-stage nozzle
trailing edge &
first-stage bucket
leading edge
1.50-8UN-2B
26.4 in. (Aft)
8
Second-stage nozzle
leading edge &
first-stage bucket
trailing edge
1.50-8UN-2B
Eddy Current &
Borescope
29.3 in. (Aft)
1
Second-stage nozzle
trailing edge &
second-stage bucket
leading edge
1.00-8UNC-2B
1.50-8UN-2B
Nozzle Deflection Only
36.2 in. (Aft)
36.4 in. (Aft)
3
1
Third-stage nozzle
leading edge &
second-stage bucket
trailing edge
1.50-8UN-2B
Eddy Current &
Borescope
39.1 in. (Aft)
1
Third-stage nozzle
trailing edge &
third-stage bucket
leading edge
0.75-10UNC-2B
46.3 in. (Aft)
4
Forward
Aft
Turbine Shell
Compressor
Discharge Casing
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......