Combustion Inspection — Reassembly Procedures
Inspection and Maintenance — GEK 107048
CI-R-21
Operation 12 — How to Install the Turbine Casing Blank Cover on Hand Hole Port or the
Atomizing Air Extraction Manifold Whichever Applies
1. Install new gasket(s), coat the bolts with Fel Pro C-102 anti-seize compound.
2. Install blank cover or atomizing air extraction manifold to turbine casing.
3. Install all bolting and torque to 129–148 lb. ft. using a crisscross tightening sequence.
Operation 13 — How to Install the Secondary Flame Detectors
1. Install new gaskets on the flame detector flanges of the secondary fuel nozzles of chambers 1,
2, 8 and 9.
2. Install flame detector body with the cooling water connections facing down.
3. Install the flame detector to the body.
4. Install the cover on the body.
5. Connect the water cooling lines to both the primary and secondary flame detector bodies.
6. Connect the power supply to the detectors for the primary and secondary flame detectors.
Operation 14 — How to Reconnect the Ignitors
1. Connect the spark plug leads to the ignitors.
Operation 15 — How to Assemble the Turbine Compartment Roof and Side Panels
1. Reassemble lagging side panel vertical beams, if any were removed during disassembly opera-
tion.
2. Attach four eyebolts to threaded receptacles on the roof. Rig the roof using a chainfall for lifting.
3. Apply new gasketing or caulking to roof section.
4. Lift the turbine roof over the turbine compartment and carefully lower, using the chainfall, into
position.
5. Apply Fel Pro C-102 anti-seize compound to the bolting and bolt in place.
6. Reconnect the blower(s) motor leads and conduit connection at underside of the roof.
7. Reconnect exhaust frame cooling piping flanges.
8. Reconnect (if applicable) VA14 valve, electrical wiring and conduit.
9. Reconnect fire suppression piping and any other piping removed.
10. Make a complete visual inspection at topside and underside of roof to ensure all components have
been assembled and reconnected.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......