Hot Gas Path Inspection — Reassembly Procedures
Inspection and Maintenance — GEK 107048
HGP-R-21
f. Place unit on ratchet and observe for leaks, abnormal noises, or control deficiencies.
g. Prime fuel pump.
6. Crank the unit, and perform the following checks:
a. Observe pickup rpm of speed sensors versus time.
b. Inspect for casing air leaks.
c. Observe and record vibration levels.
d. Observe and record maximum crank speed.
e. Check starting means for proper operation.
f. Listen for abnormal noises.
g. Check temperature of lube oil in bearing drains or at the bearing header and tank.
h. Observe all panel pressure gauge readings for abnormalities.
i. Trip unit using the emergency trip, and listen for abnormal noises from gas turbine and asso-
ciated equipment during coastdown.
j. Observe proper drop-out rpm of speed sensors.
7. Initiate a start, and perform the following zero to full-speed-no-load checks:
a. Observe applicable firing check parameters.
b. Check spark plugs and flame detectors.
c. Observe and record acceleration rates.
d. Record full set of vibration readings.
e. Observe and record temperatures suppression set point.
f. Note and record pick up time of all appropriate electrical speed relays.
g. Adjust full-speed-no-load rpm to specifications.
h. Check digital set point.
i. Take a complete set of running data and record on Operating Data form as shown in the Run-
ning Inspection section of this Service Manual.
j. Make governor checks.
k. Make overspeed checks per unit control specifications in unit Service Manual.
l. Stake sight port plugs in place, using two stakes on each plug, after shutdown.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......