GENERAL
Operation of the combustion gas turbine, as of any rotating power equipment, must include a planned pro-
gram of periodic inspection, with accompanying repair and replacement of parts as necessary, to ensure the
maximum availability and reliability of the unit.
The object of this Maintenance Section is threefold:
1. To aid the user in becoming familiar with the unit by separating the inspections according to specific
systems and, where appropriate, describing briefly the reason for the inspection and the action to
be taken.
2. To identify those components and parts that should be periodically examined between the initial
start-up tests and the designated inspection.
3. Inspection intervals herein are based on engineering judgment and experience gained with gas turbine
units. The actual time interval established for any particular gas turbine should be based on the user’s
operating experience and on ambient conditions, such as humidity, dust, and corrosive atmosphere.
Prior to scheduled inspections or taking operating data, clean the compressor per the gas turbine compressor
cleaning procedure in the Water Wash/Cleaning Tab section of Volume II. Before and after any inspection a
complete set of operating data including vibration readings should be taken and recorded for reference. A re-
cord of the inspections made, and the maintenance work performed, will be most valuable in helping to estab-
lish a good maintenance program for the gas turbine unit(s). It is expected that the maintenance program will
start with minor work, and increase in magnitude over a period of time to a major overhaul, and then repeat
the cycle. The performance of inspections can be optimized to reduce unit outage time and maintenance cost
for a particular mode of operation, and still maintain maximum availability and reliability of the unit.
Operating Factors Affecting Maintenance
Note:
The effect of maintenance factors for fuel, starts and load duty are cu-
mulative if all the above factors are present. It should also be under-
stood that as the maintenance factor increases the time between in-
spections and components repairs decreases and it is possible that
component replacement frequency will increase.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......