Major Inspection — Disassembly Procedures
Inspection and Maintenance — GEK 107048
MI-D-1
I. Disassembly Procedures (Major Inspection)
For MS-6001B DLN-1 Equipped Machines
Operation 1 — Perform Alignment Checks Before Any Unit Disassembly is Begun
Note:
It is suggested that assistance be obtained from your General Electric
Company Field Service Representative when performing alignment
checks.
1. Remove the load coupling guard and screen.
2. Remove the accessory coupling guard bottom cover. Remove the bolting from the accessory gear
end of the guard and the two top bolts which connect the guard to the turbine end coupling guard
section. Lift this section off.
3. Remove the bolting from the turbine end of the coupling guard and lift off this section.
4. Bag all removed hardware and identify for reassembly.
5. Check turbine to load gear alignment.
Note:
Use the hydraulic ratchet to rotate the unit for turbine to load gear
alignment checks. Indicate both face and rim readings on the station-
ary load gear rotor.
a. Check alignment of turbine to load gear at the load gear end of the load coupling. This allows
an alignment procedure which is identical to the one employed during installation. The turbine
to load gear coupling must be unbolted and jacked apart. Matchmark load coupling prior to
unbolting and jacking apart.
Note:
The output coupling is accessible for removal and replacement during
major inspection since the exhaust frame is disassembled, however spe-
cial fixturing (tooling) is provided to remove and replace the output
coupling and to disassemble and assemble the number 2 bearing with
the exhaust frame in place.
CAUTION
All upper half casings must be installed and the turbine
supported on its own support mounts prior to checking
alignment.
b. Position a dial indicator for a vertical reading on the O.D. of the load coupling every 45
°
. Ro-
tate turbine rotor and record coupling runout on Inspection Form PGS/GT-FF-6114. Refer to
the Basic Alignment Instruction (Field) in the Reference Drawing section of this Service Man-
ual for tolerances.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......