Combustion Inspection — Inspection Procedures
Inspection and Maintenance — GEK 107048
CI-I-13
CAUTION
Do not contaminate thermal barrier coating with pene-
trant.
5. Figure CI-I.9 shows a typical slot cooled combustion hole and portion of two bands of cooling
holes. Areas that should be looked at closely are identified as follows:
a. It is important to verify that there are no cracks emanating from the combustion holes (A) and
no cracks between the cooling holes, or from the cooling holes toward the combustion holes
(B).
b. The cooling ring overhang should be inspected to detect cracks or warpage. Particularly inspect
the overhang in the cooling panel behind the crossfire tube ports and combustion holes.
c. Check the liner stops for wear, cracks or deformation due to improper handling.
d. Liner stop welds should be inspected for cracks.
6. Inspect the liner spring seals for axial cracks, circumferential cracks, distortion (flattening), wear,
missing leaves, bent leaves or spotweld cracks. See Table CI-2 for inspection criteria.
7. If any spring seals are reshaped, ensure the leaf curvature height is similar to adjacent leaves and
“PI” tape dimension (11.21
±
0.02 in.).
8. Liquid penetrant check any spring seal leaves that have been reshaped.
9. Inspect liner rivets for weld cracks and missing rivet ends.
10. Inspect the combustion liner fuel nozzle collars for wear.
11. Inspect crossfire tube collar for cracks, wear and distortion.
12. Inspect the cap assembly, support frame, impingement cooling plate and plates around primary
cups for weld cracks.
13. Inspect the cap assembly to determine if it is loose in liner.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......