Inspection and Maintenance — GEK 107048
Hot Gas Path Inspection — Inspection Procedures
HGP-I-22
Inspection Form PGS/GT-FF-6105) is known. Then see if the gaps are within the minimum speci-
fied allowance for the worst diaphragm tooth condition.
Operation 6 — How to Make First Stage Nozzle Ellipticity Checks
Note:
Ellipticity is the condition of deviation from a circular form. Measure-
ment of the first stage nozzle is to determine the amount of deviation,
or the, “Out of Roundness,” of the nozzle assembly when it is measured
out of the unit. Ellipticity can be measured on the first stage nozzle since
the segments are held in place by a retaining ring and are removed as
an assembled unit in both the upper and lower halves. The second and
third stage nozzle segments are assembled to the turbine casing and el-
lipticity checks are not required.
Assistance from your General Electric Company Field Service Repre-
sentative in obtaining ellipticity readings is recommended.
1. Set the upper and lower halves of the first stage nozzle on a reasonably level surface and take ellip-
ticity readings as called for on Inspection Form PGS/GT-FF-6097.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...