Inspection and Maintenance — GEK 107048
Hot Gas Path Inspection — Reassembly Procedures
HGP-R-22
m. Periodically recheck torque on fuel nozzle mounting flange bolts after shutdown.
8. After synchronizing the unit and closing the breaker, perform the following load checks
(as applicable):
a. Take full set of load data per 1, 2 and 3 below and record on Operating Data form as shown
in Running Inspection section.
Preselect load points.
Base load.
Peak load.
b. Check for air, oil, gas and water leaks.
9. Observe normal unloading and shutdown as follows:
a. Note and record coastdown time.
b. Listen for abnormal noises from gas turbine, and associated equipment, during coastdown.
c. Observe unit vibration readings during coastdown.
d. Check to ensure sight port pipe plugs have been staked in two places after shutdown.
e. Periodically recheck torque on fuel nozzle mounting flange bolts after shutdown.
10. PGS/GT-FF Field Inspection Forms.
a. Submit a complete set of all PGS/GT-FF Field Forms and operating data filled out during the
hot gas path inspection, including PGS/GT-FF-6000 Site Information to your General Electric
Company Field Service Representative.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......