Hot Gas Path Inspection — Inspection Procedures
Inspection and Maintenance — GEK 107048
HGP-I-13
Figure HGP-I.12. Second and Third-Stage Bucket Repair Limits.
1.5
Inch
0.24
Inch
Max.
Depth
Second Stage
Repairs Allowed In
the Outer One-Fifth
of the Airfoil
Smoothly
Blended
30
°
30
°
Max
0.25
Inch
Cross Hatched Line Shows
Portion of Shroud That
Mat Be Removed
0.35
Inch
Repairs Allowed In the
Outer One Third of the Airfoil
0.35
Inch
Max
Depth
Third Stage
Major Material Removals Within 2.0 In. of the Tip Shroud Should Be Accompanied By Removal of the Tip Shroud.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......