Inspection and Maintenance — GEK 107048
Standard Practices
SP-56
MS-6001B DLN-1 — Major Inspection Recommended Spare Parts (Cont’d)
Recommended
Quantity
DUCTING AND PLENUM ARRANGEMENT INLET (ML1612, A041) (Cont’d)
**5.
Gasket, Access Cover Plate (Plenum Arrangement)
4
**6.
Gasket, Duct Inlet
1
**7.
Gasket, Duct Inlet
1
**8.
Gasket Duct Inlet
4
**9.
Gasket Duct Inlet
2
10.
Bolt, Hex Head N17P29028
*80
*
11.
Nut, Hex (.50–13) N205P29
*72
*
12.
Bolt, Hex Head N17P29036
*9
13.
Washer, Plain Wide N402P75
*45
*
DUCTING AND PLENUM ARRANGEMENT EXHAUST (ML1625, A042)
Note:
The list of gaskets, nuts and bolts shown below with varying quantities,
indicates that there are different sizes required. Using the applicable
ducting and plenum arrangement exhaust drawings, the user should
procure the gasketing and the hardware quantities shown.
1.
Insulation, Needlemat (Aft Side) Plenum
AR
2.
Expansion Joint Segment (Forward Side) Plenum
14
3.
Clamp Segments, Expansion Joint Forward Side
14
**4.
Gasket, Exhaust (Forward Side) Plenum
1
5.
Bolt, Hex Head N14P29020
56
6.
Expansion Joint Segment (Aft Side) Plenum
14
7.
Clamp Segments, Expansion Joint Aft Side
14
**8.
Gasket, Exhaust (Aft Side) Plenum
1
9.
Nut, Hexagon (Exhaust Ducts To Exhaust Transition Piece) N227P35
*19
*
10.
Bolt, Hex Head (Transition Piece To Exhaust Plenum) N24P29028
*19
*
11.
Gasket (Transition Piece To Exhaust Plenum)
1
12.
Cement, Contact (Transition Piece To Exhaust Plenum)
AR
13.
Bolt, Vertical Exhaust Removable Door Sides & Top, N24P33044
64
14.
Nut, Vertical Exhaust Removable Door Sides & Top, N227P33
64
15.
Washer, Vertical Exhaust Removable Door Sides & Top, N402P47
64
16.
Bolt, Exhaust Plenum Removable Door, N22P25024
28
17.
Nut, Exhaust Plenum Removable Door, 974A827P6
28
18.
Washer, Exhaust Plenum Removable Door, N402P43
28
**19.
Gasket, Exhaust Plenum Removable Door, 238A273P324
AR
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......