Major Inspection — Inspection Procedures
Inspection and Maintenance — GEK 107048
MI-I-5
Note:
The cumulative width of all scratches in circumferential and axial di-
rections should not exceed 0.100 in. (Circumferential or axial pit for-
mations exceeding three in number must be counted as continuous
scratches.) Raised metal may be removed by scraping or lightly polish-
ing the affected area with “Plastic Wool” such as “Scotchbrite.” Dam-
age that exceeds the specified limits requires replacement of the bear-
ing liner.
7. If the bearing liner has experienced excessive temperatures, the babbitt will show evidence of
smear and wiping. If the wiped area is less than five percent of the liner lower-half area, the bear-
ing may be reused after re pair of the wiped surface. Larger wiped areas must be repaired by an
approved General Electric Company Repair Facility. Before replacing the liner, the cause of the
wipe must be determined and corrected.
8. Most journal bearings develop polished areas during low speed cranking or coastdown condi-
tions. The polished area is usually found at the bottom centerline of the bearing liner and should
extend along the entire length of the bearing. This type of pattern is normal and should not be
cause for any alarm. If, however, the polished area is found only on one edge of the liner, or if
it appears on the liner upper half, a problem is indicated which must be corrected to prevent even-
tual bearing wipe.
9. Measure journal diameter at two planes, fore and aft. Record these dimensions and the general
condition of the journals on Inspection Form PGS/GT-FF-6116. Roundness and taper are two of
the most critical dimensions associated with a bearing journal. These dimensions are established
with a four point check taken in the vertical and horizontal planes (at 90 degrees to one another)
at both the forward and aft edge of the journal. If the journal diameter is 0.002 in. or more outside
of its drawing tolerance, and, if the liner-to-journal clearance falls outside of the drawing toler-
ances, it may be necessary to remachine the journal. It should be noted that whenever a journal
is remachined, the rotor must be rebalanced. Journal tapers that fall outside of the specified draw-
ing tolerances may also require remachining and rebalancing. Scratches or pits that are not over
0.005 in. deep, pits that are not over 0.100 in. in diameter and pits or scratches that do not extend
axially more than 1/3 of the bearing width, (axial scratches and pit formations must be circumer-
entially at least 45 degrees apart) are acceptable. Raised metal is not allowed.
Note:
The cumulative width of all scratches in circumferential and axial di-
rection should not exceed 0.100 in. (Circumferential or axial in-line pit
formations exceeding three in number must be counted as continuous
scratches.)
Raised metal may be removed by lapping, stoning, or lightly strapping
the entire journal surface. Damage that exceeds the specified limits
may be repaired by an approved General Electric Company repair fa-
cility by skim cutting the journal to a diameter 0.002 in. below drawing
minimum. Deeper imperfections must be repaired by turning the jour-
nal to the next appropriate undersize diameter specified by an ap-
proved General Electric Company repair facility.
10. Clamp the number one (1) and the number two (2) bearing halves together, and make a six point
check for inside diameter. Record all bearing and journal measurements and condition on Inspec-
tion Form PGS/GT-FF-6116. Record all bearing seal clearances and condition on Inspection
Forms PGS/GT-FF-6109 and PGS/GT-FF-6110.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......