Standard Practices
Inspection and Maintenance — GEK 107048
SP-45
MS-6001B DLN-1 — Combustion Inspection Recommended Spare Parts (Cont’d)
Recommended
Quantity
PIPING ARRANGEMENT COOLING AND SEALING AIR (ML0909) (Cont’d)
14.
Connector, Male
2
15.
Connector, Male
10
16.
Connector, Tube Female
1
17.
Elbow, Union
3
18.
Elbow, Union
2
19.
Elbow, Union
7
20.
Union, Tube
2
21.
Union, Tube
4
22.
Union, Tube
7
23.
Tee, Tube Union
2
24.
Nut, Self Locking
*5
25.
Nut, Self Locking
*6
26.
Nut, Self Locking
*6
THERMOCOUPLES, EXHAUST AND TRIP (ML0623)
1.
Exhaust and Trip Thermocouples
16
RING RETAINING TURBINE NOZZLE FIRST STAGE (ML1401)
1.
Insert, Wire Locking (Helicoil)
4
2.
Insert, Wire Locking (Helicoil)
9
3.
Wire, Insert (Helicoil)
30
4.
Wire, Insert (Helicoil)
1
MS-6001B DLN-1
Hot Gas Path Inspection
Recommended Spare Parts
Note:
Refer to your Parts Volume of this Service Manual to obtain the proper
drawing and/or part number for the material listed under each ar-
rangement or assembly drawing.
Recommended
Quantity
PRIMARY FUEL NOZZLE ASSEMBLY (ML0513)
1.
Tip Assembly (Gas)
50
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......