GE Power Systems
Gas Turbine
Inspection & Maintenance Procedures
Rev. 0 (11/98)
IMP–1
Inspection and Maintenance Procedures
Reformated, September 1991
STANDARD MAINTENANCE ITEMS
Pressure Switches and Gauges
The setting of pressure switches and calibration of the gauges can be checked with a dead weight tester,
a regulated source of clean, dry, compressed air or a nitrogen cylinder and a calibrated pressure gauge.
The use of air pressure is generally more convenient and is recommended whenever the air pressure is
sufficient to check the specified switch setting and gauge calibration. To avoid the possibility of oil con-
tamination, it is preferable that air actuated switches and gauges not be tested with the dead weight tester.
CAUTION
Pressure gauges on heavy fuel lines have a medium-
separation diaphragm to keep heavy fuel from solidifying
in the sensing line. Removal of the pressure switch and
loss of the fluid will damage the diaphragm or allow air
into the system. Both events will cause the gauge or switch
to read incorrectly.
Thermometers (Dial Type)
To calibrate a dial-type stem thermometer, immerse the sensor a minimum of two inches (5 cm) in an
agitated bath maintained at a temperature between
1
/
2
and
3
/
4
of its full-scale reading or near the maxi-
mum temperature normally registered by that particular thermometer, if known. By means of an external
adjusting screw, rotate the thermometer dial face until the pointer registers the correct temperature. The
bath temperature must be monitored by a thermal sensing device known to be accurate.
Flowmeter
The
±
1.5% accuracy of the flowmeter should be checked and calibrated by the manufacturer or a quali-
fied facility.
Summary of Contents for MS6001B
Page 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...INSERT TAB INTRODUCTION ...
Page 14: ......
Page 25: ...INSERT TAB STANDARD PRACTICES ...
Page 26: ......
Page 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Page 88: ......
Page 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Page 134: ......
Page 157: ...INSERT TAB COMBUSTION INSPECTION ...
Page 158: ......
Page 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Page 240: ......
Page 313: ...INSERT TAB MAJOR INSPECTION ...
Page 314: ......
Page 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 363: ...INSERT TAB MAINTENANCE FORMS ...
Page 364: ......