
Tab Navigation
3-6
72A-1898 Rev. A 11/01
Monday
, November 26, 2001 1:09 pm
The Test Plan and TDR9000 tabs are used to configure Test Plans as
follows:
Test Plan
All data can be configured here. This includes
channel activation and the input of the
performance specifications. The data fields present
on this tab are fully explained in Appendix A
”TRXField™ Software and Circuit Breaker Testing
Theory”.
TDR9000
This tab contains the Virtual Front Panel. Channel
activation and labeling can be set. Refer to ”Setting
Up a Test Plan Manually with TRXField™”
on page 4-43 for configuration information.
The Edit Specs., Tabulation and Graphics tabs are used to work with Test
Results as follows:
Edit Specs.
This tab displays all of the parameters that were
configured when the test was run. Some of these
fields are active and editable. When these fields
are edited, the data displayed on the Tabulation
and Graphics tabs change to reflect the effect new
parameter settings have on the data gathered
during the test. This is a useful way in which to
study and compare data on circuit breaker
operations.
N
OTE
The Edit Specs. functionality does not change the specifications in the
original Test Plan, nor does it change the actual data gathered during
that test.
Tabulation
Tabular Test Results are viewed on this tab.
Graphics
Graphical Test Results are viewed on this tab.
The presentation characteristics of the results are
tailored, using the operations explained in
”Working with Test Results” on page 4-81.
The contents of the
Test
Plan
,
Tabulation
and
Graphics
tabs are printable
using the optional printer, or any other connected printer.
N
OTE
TRXField also supports a functionality that displays multiple Test Results
together on a Graphics Overlay tab. This function is performed using
the Overlay Graphics selection of the File menu.
Содержание TDR9000
Страница 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...