Running the Continuity Test
The Continuity Test is recommended. This test confirms that all Main
Contact cable clamps are properly connected. Run this test after
equipment setup is complete and before any other test is run.
The Test Results shown in Figure 4.8 on page 4-70 include the channel
label and a Pass/Fail indication whose text format is configured on the
TRX
Options
window (see page A-31).
Note
This test
MUST
be performed with the circuit breaker closed.
To perform a Continuity test:
1.
Select
Continuity
from the picklist of the right side of the Virtual Front
Panel, as shown in Figure 4.43.
Figure 4.43 Continuity Test Selection
Содержание TDR9000
Страница 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...