
Configuring the TDR9000
™
: General Procedure
4-26
72A-1898 Rev. A 11/01
Monday
, November 26, 2001 1:09 pm
3.
Import a Test Plan from TRX, by:
a. Using an existing Library Test Plan
b. Modifying a Library Test Plan to create a specific Circuit
Breaker Test Plan
c. Using an existing Circuit Breaker Test Plan as the basis for a
new test
d. Creating a new Test Plan, using the TRXField software default
values as a basis
Refer to ”Connecting the TDR9000™ Physical Front Panel”
on page 4-30.
4.
Configure the Virtual Front Panel.
If an item is not configurable via the Virtual Front Panel, return to the
Test
Plan
tab to access it. For example, Travel Specifications for the
Motion portion of the OCB/Motion module, is only configurable from
the
Test
Plan
tab.
For any test, the configuration process can include:
• ”Configuring the OCB/Motion Module” on page 4-45
• ”Configuring the EHV Module” on page 4-48
• ”Configuring the Event Module” on page 4-51
• ”Configuring the System Module” on page 4-54
• ”Selecting a Test Type” on page 4-56
Содержание TDR9000
Страница 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...