
TDR9000
™
Circuit Breaker Test System User’s Guide
72A-1898 Rev. A 11/01
2-7
Monday
, November 26, 2001 1:09 pm
EHV
The EHV module measures:
• Main Contact timing of a Live Tank circuit breaker
• Pre-insertion resistor switch timing
• Capacitance of grading capacitors (optional)
• Ohmic value of pre-insertion resistors (optional)
The software supports two configuration choices:
EHV
Measures two breaks per phase on all three phases
(6 contacts).
Split
Tests breakers with odd numbers of interrupters per
phase, or activates and tests one contact at a time
in a module.
Figure 2.5 gives the available configurations for the EHV module.
Figure 2.5 EHV Module Configuration
Event
The Event module is split into two parts:
• Analog channels
• Auxiliary contacts
A combination of these channels is used to monitor the characteristics of
the circuit breaker’s operating mechanism. All the channels are used
when performing First Trip/Close tests.
Содержание TDR9000
Страница 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...