Step 2B: Running the Continuity Test (Recommended)
1-20
72A-1898 Rev. A 11/01
Monday
, November 26, 2001 1:09 pm
Step 2B: Running the Continuity Test (Recommended)
Figure 1.15 shows the initial
Continuity Test
window.
N
OTE
The Continuity Test must be run with the circuit breaker in the closed
position.
If the Continuity Test fails, check all test connections starting with the
connections to the circuit breaker, then the connections to the TDR9000
Physical Front Panel.
For instructions on performing this test, refer to ”Running the Continuity
Test” on page 4-71.
Figure 1.15 Continuity Test
Содержание TDR9000
Страница 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...