
Step 1: Circuit Breaker Preparation
1-2
72A-1898 Rev. A 11/01
Monday
, November 26, 2001 1:09 pm
5.
Connecting the Breaker Control cable to the control circuit of the
circuit breaker
6.
Connecting the:
a. Trip leads across the terminals of the manual Trip switch on
the circuit breaker control panel
b. Close leads across the terminals of the manual Close switch
on the circuit breaker control panel
Alternately, connect the two trip leads between the +DC voltage and
the trip coil and the two close leads between the +DC voltage and the
close coil.
7.
Connect either:
• An OCB Contact Monitor cable to the appropriate circuit breaker
bushings as listed in Table 1.1
or
• The EHV Contact Monitor cables to the appropriate circuit
breaker bushings as listed in Table 1.2.
Содержание TDR9000
Страница 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...