ii
General contents
General contents
iii
9. Connecting the absolute battery
3-19
10. Replacing the absolute battery
3-21
11. Connecting a regenerative unit
3-22
12. Precautions for cable routing and installation 3-23
12.1 Wiring methods
3-23
12.2 Precautions for installation
3-25
12.3 Methods of preventing malfunctions
3-25
13. Checking the robot controller operation
3-26
13.1 Cable connection
3-26
13.2 Emergency stop input signal connection
3-27
13.3 Operation check
3-28
Chapter 4 OPERATION
1. Operation overview
4-1
2. The RCX robot controller
4-2
2.1 Part names
4-2
2.2 Main functions
4-2
3. RPB programming box
4-3
3.1 Part names
4-3
3.2 Main functions
4-3
3.3 Connection to the robot controller
4-5
3.4 Changing the RPB screen settings
4-6
4. Turning power on and off
4-7
5. Operation keys
4-9
5.1 RPB screen
4-9
5.2 Operation key layout
4-11
5.3 Basic key operation
4-12
5.4 Function keys
4-13
5.5 Control keys
4-15
5.6 Data keys
4-17
5.7 Other keys
4-17
6. Emergency stop
4-18
6.1 Emergency stop reset
4-19
7. Mode configuration
4-21
7.1 Basic operation modes
4-21
Summary of Contents for RCX240
Page 1: ...RCX240 EUR6127206 E107 Ver 2 06 Userʼs Manual YAMAHA 4 AXIS ROBOT CONTROLLER ...
Page 2: ......
Page 18: ......
Page 34: ......
Page 78: ......
Page 402: ......
Page 448: ...5 46 Chapter 5 TWO ROBOT SETTING MEMO ...
Page 450: ......
Page 480: ...6 30 Chapter 6 PARALLEL I O INTERFACE MEMO ...
Page 482: ......
Page 494: ......
Page 506: ......
Page 512: ......
Page 522: ......
Page 611: ...INDEX ...
Page 612: ......
Page 617: ......
Page 619: ......