5
- 8
5.4 Testing the CC-Link IE controller network module
5
PREPARATION AND SETUP
Figure 5.6 Procedures for testing the CC-Link IE controller network module (Continued)
Turn On the external power supply. Check the power
supply module's POWER LED and the CC-Link IE
controller network module's RUN LED are ON.
Self-loopback test
Check the hardware of the communication circuit by the
CC-Link IE controller network module itself.
Section 5.4.2 Self-loopback test
Check the hardware inside the CC-Link IE controller
network module.
End
Power-on
Hardware test
Set the RUN/STOP switch of the CPU module to STOP.
Check the voltage supplied to the power supply module
is within the specified range.
Before power-on
1)
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......