5
- 34
5.7 Test before CC-Link IE controller network Operation
5.7.1 Communication test
5
PREPARATION AND SETUP
(d) Routing parameters of relay station 1
(e) Routing parameters of relay station 2
(3) Executing the communication test
1) Select [Diagnostics]-[CC IE Control diagnostics] from the menu.
2) Click
in the [CC IE Control Network Diagnostics] dialog
box.
3) The [Communication Test] dialog box is displayed.
4) Setting the following items and clicking
executes the
communication test.
Figure 5.43 Routing parameters of relay station 1
Figure 5.44 Routing parameters of relay station 2
Figure 5.45 [Communication Test] dialog box
Table 5.15 Setting items in [Communication Test] dialog box
Item
Description
Destination
Network No.
Set the network No. of the communication target.
(Setting range: 1 to 239, Default: 1)
Station No.
Set the station No. of the communication target.
(Setting range for Universal model QCPU: 0 to 120, Default: 1)
(Setting range for other than Universal model QCPU: 0 to 64, Default: 1)
Communication
data
Length
Set the length of the communication data.
(Unit: Bytes) (Setting range: 1 to 900, Default: 100)
Communication
count
Set the number of communications.
(Setting range: 1 to 100, Default: 1)
W.D.T
Set a timeout time of the communication test. (Unit: Seconds)
(Setting range: 1 to 100, Default: 5)
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......