5
PREPARATION AND SETUP
5.4 Testing the CC-Link IE controller network module
5.4.1 Hardware test
5
- 13
1
O
V
ER
VI
E
W
2
SYST
EM
CO
NF
IG
URA
T
IO
N
3
SPECI
F
IC
A
T
IO
N
S
4
F
UNCT
IONS
5
PREP
ARA
T
IO
N AND
SET
UP
6
P
A
RAM
E
T
E
R
SET
TI
NG
7
PRO
C
ESSI
NG
T
IM
E
8
PRO
G
R
AM
M
ING
* 1 When the redundant system is in separate mode, power OFF and ON only system B or reset the
CPU module of system B.
* 2 When the redundant system is in separate mode,
1) Set the mode of system B to online mode, and write the data to the system B CPU.
2) Power OFF and ON only system B or reset the CPU module of system B.
3) Connect GX Developer to the control system CPU, and change the mode of the redundant
system to backup mode.
POINT
The hardware test result can be confirmed with the link special relay (SB0090,
SB0091). (
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......