5
PREPARATION AND SETUP
5.6 Tests for CC-Link IE controller network Startup
5.6.1 Circuit test
5
- 25
1
O
V
ER
VI
E
W
2
SYST
EM
CO
NF
IG
URA
T
IO
N
3
SPECI
F
IC
A
T
IO
N
S
4
F
UNCT
IONS
5
PREP
ARA
T
IO
N AND
SET
UP
6
P
A
RAM
E
T
E
R
SET
TI
NG
7
PRO
C
ESSI
NG
T
IM
E
8
PRO
G
R
AM
M
ING
POINT
(1) When executing the circuit test, connect each cable properly between OUT
and IN.
Also, do not insert or remove a cable during test execution.
(Doing so will result in error completion.)
(2) The circuit test result can be confirmed with the link special relay (SB0094,
SB0095). (
Appendix 1 Link Special Relay (SB) List)
(3) For re-execution of the circuit test after circuit test completion, power OFF the
control station and then ON, or reset the CPU module.
(4) Checking the circuit test result in the CC IE Control Network Diagnostics
When the circuit test has failed, identify the cause of the error in the CC IE Control
Network Diagnostics, and take corrective actions according to the troubleshooting
section.
Then, execute the circuit test again.
For the CC IE Control Network Diagnostics, refer to the following.
Section 10.4 Checking the Error Description with the CC IE Control Network
1) Select a faulty station.
2) Click the error details button (e.g.
) to display the [Error
details] dialog box, and take corrective actions according to the
troubleshooting directions.
Figure 5.29 CC IE Control Network Diagnostics
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......