5
PREPARATION AND SETUP
5.6 Tests for CC-Link IE controller network Startup
5.6.2 Station-to-station test
5
- 27
1
O
V
ER
VI
E
W
2
SYST
EM
CO
NF
IG
URA
T
IO
N
3
SPECI
F
IC
A
T
IO
N
S
4
F
UNCT
IONS
5
PREP
ARA
T
IO
N AND
SET
UP
6
P
A
RAM
E
T
E
R
SET
TI
NG
7
PRO
C
ESSI
NG
T
IM
E
8
PRO
G
R
AM
M
ING
(c) Setting the other station to Online mode
After setting the following network parameters in GX Developer, write them to the
programmable controller.
Figure 5.32 Network parameters in GX Developer
Table 5.12 Network parameter setting items of GX Developer
Item
Set value
Network type
CC IE Control (Normal station)
Starting I/O No.
0000
Network No.
1
Group No.
0
Station No.
2
Mode
On line
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......